Five steps, with a payment milestone at each one.

  1. Free 30-minute call

    We go through what you want made, quantity, target cost and timeline, and tell you upfront if we're not a fit.

    Week 0No charge
  2. Fixed quote

    Studio work gets a fixed price. Production gets a quote built on the factory's proforma invoice plus our published fee.

    Within 3 business daysNo charge
  3. Design or sampling

    Design rounds, then physical samples. Nothing goes to production until you sign off the sample in writing.

    Weeks 1–4Studio: 50% to start
  4. Production

    The factory produces against the approved sample. We follow up weekly with photos. Lead times are factory estimates, not guarantees.

    Weeks 5–9Deposit before production
  5. Inspection and shipping

    Third-party AQL inspection before you pay the balance. We ship FOB Shenzhen; you remain importer of record. Door delivery can be arranged through a freight partner.

    Weeks 9–10Balance after inspection

Quality

AQL inspection by an independent third party on every first order, billed at cost. Your own inspector is welcome. You get the original report and photos.

Shipping

FOB Shenzhen by default. Door delivery through a freight partner on request. We don't offer DDP; you remain importer of record.

Who you pay

Every invoice comes from Everance International Limited. Bank details never change by email; we confirm any change on a video call.